Major Civil
North Sydney, NSW March 2023 – Completed

Warringah Freeway
Upgrade

High Street Bridge & Cut & Cover for CPB Downer JV
Project Overview

High Street bridge widening and Cut & Cover works on the Warringah Freeway.

DAMCON was awarded the contract for the construction of the High Street bridge widening, the High Street bridge on-ramp, the pier strengthening of the existing High Street bridge, adjacent retaining walls, adjacent road furniture, the design and installation of temporary works to facilitate these works, and the supply of materials.

The widened bridge consists of girders and a deck superstructure on piers, with footings matching existing locations. DAMCON constructed a new on-ramp from the interchange to the Warringah Freeway northbound to ease traffic congestion. The scope also included demolition works on existing abutments, bridges and road barriers, footpaths, and existing retaining walls.

Scope of Works

High Street Bridge

  • High Street bridge widening
  • High Street bridge on-ramp
  • Pier strengthening to the existing High Street bridge
  • Adjacent retaining walls and road furniture
  • Design and installation of temporary works
  • Supply of materials
  • Demolition of existing abutments, bridges, road barriers, footpaths and retaining walls
Scope of Works

Cut & Cover

The Cut & Cover scope consists of the FRP package and construction of new capping beams, portal beams and roof deck.

  • FRP package
  • New capping beams — sill and cantilever
  • Mined tunnel portal beam
  • Daylight portal beam
  • Installation of planks
  • Roof deck construction — southbound and northbound spans
  • Installation of precast flood walls
  • In-situ barriers
  • All concrete quality as per RMS QA specification B80
Project Facts
Client
CPB Downer JV
Sector
Major Civil
Location
North Sydney, NSW
Status
Completed
Duration
March 2023 – Completed
Specification
RMS QA B80
Packages
High Street Bridge Cut & Cover